lots of progress which has been visable this week, so i thought i would do an update for the week rather then daily ones. lots of goodies ordered in the internet and ebay turned up this week i am just waiting to order cushions which i will do on monday.
The ceiling is now fully insulated and boarded, just needs covering, the sink/cooker is now in place and the framework has been built, it will have a very small worktop next to it, and the 12v fridge i had from my chevy day van sits nicely underneath it, we will also be putting the gas bottles underneath here. once they have been boxed in we will need to cut a vent hole.

Also the space abouve the cab has been insulated and boarded, the shelf was carpeted with carpet origonally on the van roof, and it was boarded off with two cutouts left for doors.

Dad started work on the seat/bed concertina, this is a L shaped seat which will pull out into the bed,
however after some discussion i decided to go for a wider bed so we decided to wait till the cushions arrive before continuing.


and instead started on the shower, which has now been mocked up, it is next to the wheel arch to give some extra elbow room as the shower tray is only 585 by 585, i bought a 20 foot roll of lino from ebay which we will be using to waterproof the walls. There is also some storage above the wheel arch which we can access from both sides.



Dad has an impending sense of doom as we are leaving on the 21st february so are on a tight schedule, i have monday and tuesday off work so hopefully i can crack on with carpeting the ceiling and other panels!